Pickleball is booming across the U.S., and we’re proud to be part of the movement – this time, not as players, but as engineers. When our client envisioned a state-of-the-art pickleball court complex, they knew it needed more than a great location and some nets. It had to perform on every level: comfort, lighting, airflow, utility […]
Monthly Archives: June 2025
What It Means and Why It Matters We’re proud to announce a new milestone for our team: Pyra IXI is officially HUB-certified by the Texas Comptroller of Public Accounts (CPA). This designation recognizes Pyra IXI as a Historically Underutilized Business (HUB) in the state of Texas and opens doors to new opportunities, partnerships, and growth across the public and […]
When it comes to pharmaceutical manufacturing, precision isn’t a luxury — it’s the law. For Atilar Pharma, a fast-growing 503B outsourcing facility, meeting strict FDA requirements was non-negotiable. They needed a design team who could deliver more than drawings — they needed a partner who understood the technical demands of highly regulated environments. Engineering a Facility that Meets the […]
At Pyra IXI, we believe medical spaces — especially dental clinics — deserve more than just sterile functionality. They should be efficient, safe, and welcoming for both patients and professionals. That vision came to life in our work on the Charm Dental, a 4,000 sqft dental office where every detail was engineered for care, comfort, […]
When most people walk into a luxury jewelry showroom, they notice the lighting, the sparkle, and the atmosphere of elegance. But behind every gleaming surface is a layer of smart engineering — and that’s where Pyra IXI comes in. We were proud to provide full MEP (Mechanical, Electrical, and Plumbing) design for Ayna Jewels, a boutique jewelry brand with a […]
At Pyra IXI, we believe buildings should do more than stand tall — they should stand for something. That’s why we were proud to take part in the transformation of the 185 Sam Houston Hotel, a 7-story commercial property in Texas, into a PACE-compliant, energy-efficient space. What is PACE? Property Assessed Clean Energy (PACE) is a financing mechanism that […]
When Integra Mission Critical (IMC) scaled up to a 1 M+ sqft modular manufacturing facility with over 3,000 employees, they needed more than just production space — they needed a breakroom that could serve hundreds, and they needed it fast. What We Delivered: HVAC: Designed for comfort in a high-heat, high-occupancy industrial environment Electrical: Supporting […]
Location: 1302 Telephone Rd, Houston, TX 77023, USAProject Type: Commercial / Food Production FacilityServices Provided: HVAC Engineering, Dehumidification System, Electrical Installation, Plumbing System Project Overview Pyra Engineering delivered a full-scope MEP solution for a commercial production bakery, designed to meet the rigorous demands of food-grade environments. From maintaining climate stability to ensuring continuous and safe operations, […]
City of Brookshire, Texas 4,000 sqft Dental Office This 4,000 sqft dental office was an exciting project where Pyra Engineering provided comprehensive MEP (Mechanical, Electrical, and Plumbing) engineering services to ensure an efficient, high-performance, and code-compliant design. Given the unique requirements of a dental facility – including specialized HVAC zoning for patient comfort, medical gas […]
Client: GBC Food Services Location: 251 Renner Parkway, Richardson, Texas Scope of Work: Mechanical, Electrical, and Plumbing (MEP) Design Energy Code Compliance (COMcheck) As-built site scan and validation Coordination with client and GC throughout the construction phase Project Overview GBC Food Services, a leading provider in the food distribution industry, selected a 40,000+ sq. ft. […]










