Pyra Project – GBC Food Services Office – MEP Design & Site Coordination

  • Client: GBC Food Services
  • Location: 251 Renner Parkway, Richardson, Texas
  • Scope of Work: Mechanical, Electrical, and Plumbing (MEP) Design
  • Energy Code Compliance (COMcheck)
  • As-built site scan and validation
  • Coordination with client and GC throughout the construction phase

Project Overview

GBC Food Services, a leading provider in the food distribution industry, selected a 40,000+ sq. ft. office facility at 251 Renner Parkway for their new headquarters. Pyra Engineering was brought on board to deliver full MEP design and ensure compliance with Texas energy codes.

Challenges & Solutions

One of the key challenges was the inaccuracy of the existing architectural and MEP drawings. To address this, our team conducted an on-site visit using 3D scanning technology to accurately locate the existing ductwork, light fixtures, and electrical panels.

From that scan data, we developed a precise, site-specific MEP design that reflects real-world conditions — eliminating guesswork and minimizing delays during the buildout phase.

Results

  • Accurate and efficient MEP layout tailored to existing conditions
  • Seamless coordination with contractors during the construction phase
  • Full energy compliance documentation provided (COMcheck)
  • Positive feedback from the client, who is preparing to move in by the end of the month

“This is how we work: transforming complexity into clarity with smart, field-driven engineering.”

Site Progress

Our latest site visit confirmed that everything is lining up exactly as designed. We’re proud to see it all come together — and even prouder to support GBC Food Services as they settle into their new space.

📞 Contact us for your next MEP project.

 

Leave a Reply

Your email address will not be published. Required fields are marked *

Call Now