FREE REPORT · 14 PAGES · PUBLISHED 2026
What 374 Texas Projects Tell Us About Commercial MEP Engineering
Cost benchmarks, project mix, and what actually compresses the permit cycle — pulled from 374 anonymized Texas commercial MEP engagements. No fluff, 4 charts, the same data we sanity-check our own quotes against.
What is inside
- 1. Executive summary — three findings on one page
- 2. Methodology — sample composition (374 projects, 35 cities, 23 use types)
- 3. Project mix bar chart across the 8 most-common use types
- 4. Top 10 Texas cities by project count + AHJ commentary
- 5. The 93% statistic on TX code-basis adoption
- 6. Industry construction cost benchmarks ($/sf) by use type
- 7. Top 5 things that delay Texas commercial MEP permits
- 8. The 5-step compression playbook (offsetting actions)
- 9. AHJ familiarity matrix — jurisdictions we ship in
- 10. Recommendations for owners, GCs, and architects
Get your copy
Free. PDF arrives in your inbox in under 60 seconds.
We will not sell or share your email. You can unsubscribe at any time. Pyra Engineering, MBE/HUB-Certified, Licensed in 14 states.
The numbers in the report
374
TX projects analyzed
35
Texas cities covered
93%
on modern code stack
14
states licensed
Published by Pyra Engineering — MBE/HUB-Certified MEP design firm shipping sealed plans in TX, AZ, AR, CA, CO, FL, GA, LA, MI, MN, NJ, OH, UT, and WI. Featured at pyra-engineering.com.
