Tenant Improvement MEP Engineering for Offices in San Francisco, California
Pyra Engineering delivers sealed MEP for offices across San Francisco and the wider California metro. We're MBE-certified, licensed to seal MEP in California, and write to the codes the San Francisco AHJ actually enforces — not the generic version.
What we deliver for offices in San Francisco
- VAV / fan-coil zoning to match the demised space
- Connection to existing landlord systems (chilled water, gas, condensate)
- Lighting design and IECC compliance
- Power distribution and panelboard sizing
- Plumbing fixture count and venting per IPC
- Energy modeling when required by AHJ
- Coordination with landlord criteria and shell drawings
Recent offices work — California portfolio, anonymized
- office project — Sugar Land, CA — 3500 sf — MEDICAL OFFICE TENANT IMPROVEMENT / CODE CONVERSION scope — Sugar_Land — IBC/IMC/IPC/IFC 2021, NEC 2020, California contractor licensing CBC Chapter 11B — completed 2024. MEP; Life Safety
- office project — San Francisco, CA — 1570 sf — E scope — City of San Francisco DSD — IBC 2021, NEC 2023, IECC 2021, ASHRAE 90.1 (2019), San Francisco Amendments — completed 2024. Service entrance + meter sequence (CenterPoint 120/208V); Lighting + COMcheck compliance
- office project — San Francisco, CA — 1475 sf — M/E/P scope — San Francisco_DSD — IBC 2021, IMC 2021, IPC 2021, IFC 2021, NEC 2023, IECC 2021, ASHRAE 90.1-2019 — completed 2025. Electrical Service & Distribution; Plumbing Fixtures & Distribution
- law office — San Francisco, CA — 2166 sf — M/E/P scope — City of San Francisco — IBC 2021, IMC 2021, IPC 2021, IFC 2021, NEC 2020, UPC 2021, City of San Francisco amendments — completed 2025. MEP
- office project — CA — 1200 sf — M/E/P scope — City of Sugar Land — IBC/IMC/IPC/IFC 2021, NEC 2023, IECC 2021, CBC Chapter 11B 2021, City of Sugar Land local amendments — completed 2026. HVAC (RTU); Power + lighting
Project descriptions are anonymized. Pyra Engineering does not publish client names or contract values.
San Francisco permit notes
Frequently asked questions
Does Pyra Engineering design fire alarm or sprinkler systems?
Do I need a sealed California engineer for a office tenant fit-out project in San Francisco?
What's typical turnaround on MEP drawings for a office tenant fit-out in San Francisco?
Will Pyra Engineering stamp drawings done by a contractor or designer?
Does the MBE/HUB certification benefit me on a San Francisco project?
How does Pyra Engineering quote offices MEP design?
What's the most common reason CA office fit-outs slip schedule?
What landlord info do you need before I can ask for a TI fee?
What if the landlord shell can't support our load?
Do you handle the COMcheck for office TIs?
Can MEP be engaged at SD or is CD too late?
How is outdoor air sized for office?
Do you do VAV or fan-coil zoning?
How many panel circuits per workstation?
Do you spec lighting fixtures or just calc loads?
What about IT closet cooling?
Daylight harvesting and occupancy sensors — required?
Fire alarm modifications — your scope?
Do you handle break room / pantry MEP?
What's the typical permit cycle for office TI in San Francisco?
Do you spec emergency egress lighting?
How do you handle conference room AV power?
What's typical fee compared to a full-service A&E?
Do you do construction administration?
Will you stamp drawings done by the tenant's preferred consultant?
How do you handle landlord vs tenant utility separation?
Open: California Tenant Fit-Out MEP Schedule Risk Survey (Q2 2026)
We’re surveying 100+ California GCs, architects, and developers on what actually breaks tenant fit-out MEP schedules — and what predicts the projects that stay on time. If you’ve shipped two or more CA commercial fit-outs in the last 12 months, your data would help.
Take the 5-min survey → · respondents get an early preview of the findings before public release.
Need MEP for a office tenant fit-out in San Francisco?
Send the architectural set or a one-paragraph scope and we’ll quote within one business day.
