Sugar Land, TX · Office tenant build-out · 1,680 sq ft

An office suite build-out inside an existing multi-tenant office building in Sugar Land. PYRA IXI engineered the HVAC, electrical, and plumbing and documented energy-code compliance.
What we engineered
- HVAC design around a single 5-ton split system with an economizer
- Electrical power and lighting
- Plumbing sheets for the suite
- 2021 IECC energy compliance documentation (COMcheck)
What the job needed
Interior lighting power came in 35% better than the 2021 energy code allowance. Review comments, including duct insulation, were addressed in the resubmittal.
Like every PYRA IXI set, the drawings were sealed by a licensed Professional Engineer and drawn to the code editions the jurisdiction has adopted. The same engineering team handles review comments and construction-phase questions.
Project renderings

The images on this page are illustrative renderings of the project, not photographs of the completed space. Client name withheld.
Working on a similar project?
Send us your floor plans and equipment cuts. We reply with a fixed-fee MEP engineering proposal in 1 business day on standard scope.
Related: office tenant improvement MEP in Sugar Land · MEP engineering in Sugar Land · all projects
